Download678
Size97.20 KB
Download Article

Trion Industries is saving more than 76% per year in total lighting costs through a construction-grade energy audit of the corporate headquarters, offices, manufacturing plant and shipping facility - then implementation of a value-engineered plan to replace metal halide, sodium vapor and fluorescent lighting system with an energy-efficient fluorescent lighting systems. The entire retrofit project will pay for itself in less than 13 months, and was spearheaded by SmartWatt Energy, Inc. Read the project Case Study here.


File
Trion-Green-Case-Study.pdf